A cable-stayed footbridge with no supports in the water.
Type
Infrastructure
Location
Maringá, PR
Year
2021
Span
86 m span
Structure
Steel, cable-stayed
A cable-stayed footbridge for pedestrians and cyclists over the stream, with an 86 m clear span. Two masts carry the steel deck on cables, with no supports in the water.
The deck was assembled on the bank and launched in a single night, with the avenue closed for only six hours.